Electricity rate by DSO

# Groupe E electricity rate in 2026

Compare Groupe E's standard rate with the Local Electricity Community (LEC) rate. ElCom data 2026, WattMatch calculation for a reference photovoltaic installation (10 kW).

Consumer rate

20.73ct/kWh

energy + grid usage, excluding taxes and levies

Producer buyback

10.96ct/kWh

buyback price for the solar surplus fed in

LEC consumer rate

11.56ct/kWh

price within a Local Electricity Community at 40% grid rebate

LEC producer rate

9.56ct/kWh

producer buyback within the LEC, higher than the DSO rate

**Groupe E** serves 143 municipalities across Switzerland (Fribourg, canton FR). The standard electricity rate combines energy (11.95 ct/kWh) and grid usage (8.78 ct/kWh). By joining a Local Electricity Community (LEC) with Groupe E, you receive a grid-usage rebate of up to **40%** (art. 19h OApEl) and local energy is bought at a more favourable price than the standard rate.

## How are LEC rates calculated?

WattMatch applies the LApEl 2026 formula: total margin = consumer ceiling (Groupe E rate minus grid rebate) − producer buyback. That margin is split into three shares: **consumer** (savings on the bill), **producer** (premium above Groupe E's buyback) and **WattMatch** (commission capped at 2 ct/kWh). For Groupe E that yields a LEC consumer rate of **11.56 ct/kWh** and a LEC producer rate of **9.56 ct/kWh**.

## Coverage and eligibility

Groupe E covers 143 municipalities, LEC eligibility then depends on enough local solar generation (at least 5% of subscribed power, art. 14 EnV) inside your transformer perimeter (≈ 500 m) or substation perimeter (≈ 1.5 km). Check your address in 30 seconds to confirm eligibility.

## How to join a LEC with Groupe E

You enter your address, check eligibility in 30 seconds, sign the representation mandate online. WattMatch then handles the steps with Groupe E. Activation typically takes 4 to 8 weeks, and savings start when the LEC goes live.

## Municipalities served

104 municipalities on the Groupe E network have a detailed LEC potential analysis, ordered by descending index.

- [Attalens (FR)](https://wattmatch.ch/en/municipalities/attalens-fr)

- [Autigny (FR)](https://wattmatch.ch/en/municipalities/autigny-fr)

- [Avenches (VD)](https://wattmatch.ch/en/municipalities/avenches-vd)

- [Avry (FR)](https://wattmatch.ch/en/municipalities/avry-fr)

- [Bas-Intyamon (FR)](https://wattmatch.ch/en/municipalities/bas-intyamon-fr)

- [Belfaux (FR)](https://wattmatch.ch/en/municipalities/belfaux-fr)

- [Belmont-Broye (FR)](https://wattmatch.ch/en/municipalities/belmont-broye-fr)

- [Billens-Hennens (FR)](https://wattmatch.ch/en/municipalities/billens-hennens-fr)

- [Bösingen (FR)](https://wattmatch.ch/en/municipalities/bosingen-fr)

- [Broc (FR)](https://wattmatch.ch/en/municipalities/broc-fr)

- [Brot-Plamboz (NE)](https://wattmatch.ch/en/municipalities/brot-plamboz-ne)

- [Brünisried (FR)](https://wattmatch.ch/en/municipalities/brunisried-fr)

- [Bulle (FR)](https://wattmatch.ch/en/municipalities/bulle-fr)

- [Château-d'Oex (VD)](https://wattmatch.ch/en/municipalities/chateau-d-oex-vd)

- [Châtel-Saint-Denis (FR)](https://wattmatch.ch/en/municipalities/chatel-saint-denis-fr)

- [Châtillon (FR) (FR)](https://wattmatch.ch/en/municipalities/chatillon-fr-fr)

- [Châtonnaye (FR)](https://wattmatch.ch/en/municipalities/chatonnaye-fr)

- [Chénens (FR)](https://wattmatch.ch/en/municipalities/chenens-fr)

- [Chevroux (VD)](https://wattmatch.ch/en/municipalities/chevroux-vd)

- [Cheyres-Châbles (FR)](https://wattmatch.ch/en/municipalities/cheyres-chables-fr)

- [Corminboeuf (FR)](https://wattmatch.ch/en/municipalities/corminboeuf-fr)

- [Cornaux (NE)](https://wattmatch.ch/en/municipalities/cornaux-ne)

- [Cottens (FR) (FR)](https://wattmatch.ch/en/municipalities/cottens-fr-fr)

- [Courgevaux (FR)](https://wattmatch.ch/en/municipalities/courgevaux-fr)

[See the LEC potential of all 2,182 Swiss municipalities →](https://wattmatch.ch/en/municipalities/lec-potential)

[Join a LEC with Groupe E](https://wattmatch.ch/en/#signup) [Check my address](https://wattmatch.ch/en/join)

**Disclaimer:** indicative rates based on ElCom 2026 data and Groupe E's official filings. The grid rebate (art. 17e para. 3 LApEl, art. 19h OApEl) applies to the rebatable grid-usage component, excluding system services, the electricity reserve, the federal grid surcharge and levies. Calculation for a reference 10 kW PV installation. Real conditions vary with your consumption profile and your LEC's composition, [contact us](https://wattmatch.ch/contact) for a personalised calculation. [See Groupe E's official tariff sheets.](https://www.groupe-e.ch/fr/telechargements)
